Bengaluru Silk Board Flyover will closed for four month from Today

The government has said that the metro works from Silk Board Flyover to Kempegowda International Airport will be completed by 2026. In this background, the organization has come to the necessity of closing the Silk Board Flyover for a few months.

Namma Metro: Our metro works are going on in full swing in Bengaluru. The government has said that the metro works from Silk Board Flyover to Kempegowda International Airport will be completed by 2026. The pressure is on BMRCL to complete the works of this blue line as soon as possible.

In this background, the organization has come to the necessity of closing the Silk Board Flyover for a few months. Central Silk Board Junction flyover (Madivala side) will be partially closed for four months, BMRCL said.

BMRCL Central Silk Board Junction flyover up and down ramp carriage way (Madivala side) loops and ramp flyover staging work has been issued in this regard temporarily close from 21-10-2023 (2.50 on two carriage ways for four months) will be partially barricaded. Public cooperation is sought. We regret the inconvenience this may cause.

Bengaluru Silk Board Flyover will closed for four month from Today
Image Credit To Original Source

Also Read: Karnataka Government New Scheme: Rs 2 Lakh Loan For Women With Zero Interest

Our Metro Blue Line:

Blue Line of our Metro connects Central Silk Board to Kempegowda Airport. It will be connected to major areas.

Here are some important areas connected by Bangalore Metro Blue Line

Central Silk Board: It is a major commercial and IT hub of Bengaluru.

KR Puram: It is a residential and commercial area of ​​Bengaluru.

Malleswaram: It is a residential and cultural area of ​​Bengaluru.

Malleswaram: It is a residential and cultural area of ​​Bengaluru.

Jayanagar: It is a residential and commercial area of ​​Bengaluru.

Vijayanagar: It is a residential and commercial area of ​​Bengaluru.

Hebbala: It is the residential and IT hub of Bengaluru.

EPIP: It is an IT park in Bengaluru.

EPIP: It is an IT park in Bengaluru.

Also Read: Karnataka Dasara School Holiday May Extend Till October 31

Bengaluru Silk Board Flyover will closed for four month from Today
Image Credit To Original Source

The Blue Line connects to the Purple Line and Green Line at KR Puram. It provides a convenient way for passengers to travel across the city.

Details of Phase 2A and 2B Metro Stations of our Metro’s Blue Line 2A Metro stations:

1- KR Puram

2- Mahadevpura

3- DRDO Sports Complex

4- Doddanakundi

5- ISRO

6- Marathahalli

7- Kodibisanahalli

8- Kadubisanahalli

9- Kadubisanahalli

10- Bellandur

11- Ibbalur

12- HSR Layout

13- Silk Board

Phase 2B Metro Stations:

Kasturinagar

2- Python

3- Dodjala

4- Horamavu

5- Veerannapalya

6- Airport City

7- HRBR Layout

8- Kodigehalli

9- Kempegowda International Airport Terminal

10- Kalyan Nagara

11- Jakkuru Cross

12- HBR Layout

13- Yalahanka

14- Nagawara

15- Brngaluru Cross

16- Kempapura

17- Bettahalasur.

Comments are closed.